.

Tuesday, February 26, 2019

Project manager for a Cable Planning Essay

As the project manager for a descent Planning team, I exit manage the creation of the cable devise for a new building that will be built, with construction come out to begin in six weeks. My first task in creating a Cabling Plan is to develop an Executive Summary that will contain the support Introduction and basis Cable Specifications and archetypes. My manager gave me the over exclusively project envision that includes A detailed description of the new building, including the total number of com trampers for all of the employees of the company. Also the host and network topology hardware that is required to put the system together.Cable Standards and CodesANSI/NEMA Standards Publication No. WC 66-2001Performance Standard for division 6 and Category 7 100 Ohm Shielded and Unshielded misshapen Pair CablesANSI/transient ischemic attack/EIA-526-7Measurement of Optical Power Loss of Installed Single-Mode lineament Cable PlantANSI/transient ischemic attack/EIA-526-14AOptical P ower Loss Measurements of Installed Multimode fibre Cable PlantBICSI TDMMTelecommunications Distribution Methods Manual, 11th EditionCENELEC EN 501732000 and amendments learning Technology generic wine Cabling SystemsIEC/TR3 61000-5-2 Ed. 1.0 and amendmentsElectromagnetic compatibility (EMC) Part 5 Installation and moderation guidelines Section 2 Earthing and cablingISO/IEC 118012002 Ed 2.0 and amendmentsInformation technology Generic cabling for customer premisesNFPA70 National Electric Code obligate 645 and Article 800 2.2.15. NFPA 70E Standard for Electrical Safety in the Workplace, 2004 Edition 2.2.16. NFPA 75 Standard for the Protection of Information Technology Equipment, 2003 Ed. build Standards and CodesANSI/TIA/EIA-568-B.1, ANSI/TIA/EIA-568-B.2, ANSI/TIA/EIA-568-B.3, and addenda mercenary Building Telecommunications Cabling Standard Part 1 General Requirements moneymaking(prenominal) Building Telecommunications Cabling Standard Part 2 Balanced Twisted-Pair Cab ling Components (December 2003) Commercial Building Telecommunications Cabling Standard Part 3 Optical Fiber Cabling and Components StandardANSI/TIA/EIA-569-B and addendaCommercial Building Standard for Telecommunications Pathways and SpacesANSI/TIA/EIA-606-A and addendaAdministration Standard for the Telecommunications Infrastructure of Commercial BuildingsNFPA 76Standard for the Fire Protection of Telecommunications Facilities, 2005 EditionANSI-J-STD-607-A and addendaCommercial Building Grounding and Bonding Requirements for TelecommunicationsProject MaterialsFiber-Optic Design Considerationsa)We will be utilizing fiber oculars in various ways. We will be crafting thebackbone, and riser runs with fiber optic cables.Basement Server Complex Designa)The server will have a network capacity that trumps the 110 tidy sum/computers in the basement. One computer per person. b)We will dapple apiece of these computers to the mole outlet with standard Cat6 patch cables. c)Risers and b ackbones will be constructed with fiber optic cables. d)Horizontal runs with utilize Cat6 cabling.e)We will need 5 cisco WS-C3750 G-24PS-S24 Ports atom smasher switches to maintain the minimum standard of having 4 ports informal on to each one switchStandard Floor Designa)The network capacity of this visualise is to exceed 200 people/computers. One computer per person. b)I will patch each of these computers to the wall outlet with standard Cat6 patch cables. c)Risers and backbones will be constructed with fiber optic cables. d)Horizontal runs with utilize Cat6 cabling.e)I will need 10 Cisco WS-C3750 G-24PS-S24 Ports catalyst switches to maintain the minimum standard of having 4 ports free on each switch.Fiber-Optic Characteristicsa)SC connectors will be used to give notice optical cables.Bandwidtha)The hardware we are installing will have a speed of 1Gbps.Attenuationa)I will use special tools to test for attenuation as the project progresses, and replace accordingly. Electromag netic Immunitya)I will biyearlyally test for interference.Link Performance Analysisa)I will schedule periodic tests to verify performance, and bandwidth speeds.Cable Transmission Performancea)I will test for inconsistencies in transmissions sent and received.Splice and Connector Performancea)I will test each termination and connector to ensure it meets or exceeds the expected standards.Power work outa)I will calculate each devices antecedent requirement, to ensure adequate power is provided. b)I will use energy efficient methods, which will not have performance, but ensure that utility costs do not exceed the budget. Standard floor layout

No comments:

Post a Comment